Slide locked Sign in to view
Slide schematic 4/5
chart 2/2 list 1/1 metric 0/1 title 1/1
1 without position metric 1
metric · primary
Components 5
bar-vertical bar-vertical bullet primary headline
Tools 1
Metrics 1
Cost per ton per kilometer cost_savings · 0.3

Despite many apparent inefficiencies in the overall waste sector, the freight component of the waste supply chain appears to be relatively efficient

Frameworks 0
No frameworks

No framework match is anchored to this slide.