Slide locked Sign in to view
Slide schematic 7/9
callout 1/2 image 1/1 list 1/1 metric 0/1 paragraph 1/1 source-note 1/1 table 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 9
primary callout map bullet primary paragraph source-note data headline
Tools 0
No tools

No canon tool match is anchored to this slide.

Metrics 1
transport cost cost_savings · $100-$200

Transport cost typically covered entirely by adopter

Frameworks 0
No frameworks

No framework match is anchored to this slide.