Pioneer Natural Resources (PXD) · page 48 of 92
The slide highlights the distinction between proved reserves (845 MMBOE) and recoverable resource potential (10.2 BBOE).
Conference presentation · kpi_overview · analyze_data · dense density
Slide locked Sign in to view
Slide schematic 5/7
callout 1/2 chart 2/2 disclaimer 1/1 metric 0/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 7
primary callout pie pie disclaimer primary headline
Tools 1
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.