Pioneer Natural Resources (PXD) · page 36 of 92
The slide calculates the unit cost of reserve development by adding production to the net change in reserves and dividing total Capex by that sum.
Conference presentation · valuation_table · analyze_data · overcrowded density
Slide locked Sign in to view
Slide schematic 4/6
callout 0/1 metric 0/1 paragraph 1/1 source-note 1/1 table 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 6
callout primary paragraph source-note data headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.