A construction-tech startup that's developed a faster way to model a building's energy efficiency used this 13-page pitch deck to nab $5.7 million · page 6 of 13
The diagram is a hub-and-spoke model representing the construction ecosystem.
Pitch deck · solution · present_solution · dense density
Slide locked Sign in to view
Slide schematic 4/6
callout 0/1 diagram 1/1 metric 1/2 subtitle 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 6
callout hub-spoke big-number primary subtitle headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 1