Slide locked Sign in to view
Slide schematic 5/6
callout 1/1 chart 1/1 disclaimer 1/1 metric 0/1 source-note 1/1 title 1/1
1 without position metric 1
metric · primary
Components 6
primary bar-stacked disclaimer primary source-note headline
Tools 0
No tools

No canon tool match is anchored to this slide.

Metrics 1
TREO ktpa other · 112 thousand tons

In the rest of the world the pipeline of heavy projects is limited to less than 10k tons

Frameworks 0
No frameworks

No framework match is anchored to this slide.