Slide locked Sign in to view
Slide schematic 8/10
callout 4/5 chart 1/1 metric 0/1 source-note 1/1 table 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 10
primary primary primary primary callout bar-stacked primary source-note data headline
Tools 0
No tools

No canon tool match is anchored to this slide.

Metrics 1
Total cost per tonne cost_savings · 473

An aggregate cost has been used to assess the waste supply chain holistically. Some interpretative considerations are important

Frameworks 0
No frameworks

No framework match is anchored to this slide.