Completion of the NBN build phase enables focus on a range of upgrades
Infrastructure beyond COVID-19 · page 138 of 189
Infrastructure beyond COVID-19 · slide 138
Consulting deck · industry_trends · summarize · overcrowded density
Slide locked Sign in to view
Slide schematic 6/8
callout 2/3 list 2/2 metric 0/1 source-note 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 8
primary primary callout bullet bullet primary source-note headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 1
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.