Risk management in transformation · page 21 of 42
The chart is a 100% stacked bar chart representing priority levels from 1 (low) to 5 (high).
Consulting deck · data_table · analyze_data · overcrowded density
Slide locked Sign in to view
Slide schematic 6/8
callout 0/1 chart 1/1 legend 1/1 metric 0/1 paragraph 2/2 title 2/2
2 without position callout 1 · metric 1
calloutmetric · primary
Components 8
callout bar-stacked-100pct legend primary paragraph paragraph headline subtitle
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.