Reinforcing the New South Wales Southern Shared Network (HumeLink) PADR – EY Market Modelling · page 15 of 17
The slide compares two sets of line charts showing pump and generation capacity factors over time.
Consulting deck · scenario_analysis · analyze_data · dense density
Slide locked Sign in to view
Slide schematic 6/7
callout 1/1 chart 2/2 metric 0/1 title 3/3
1 without position metric 1
metric · primary
Components 7
primary line line primary headline subtitle subtitle
Tools 5
Action Titles slide · 90%
Headline reads 'Snowy 2.0 operation increases earlier in Step/Fast and later in Slow scenarios'.
Contrast Pairs slide · 80%Side-by-side 'Base Case' vs 'Option 3C' line charts on shared axes.
Scenario Analysis slide · 90%The slide discusses Snowy 2.0 operation increases under different scenarios (Step Change, Fast Change, Slow Change).
Small Multiples slide · 70%Two parallel charts using identical encoding for direct comparison.
So What? Test slide · 80%Title links Snowy 2.0 utilisation to coal retirement timing — explicit so-what.
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.