Should process optimization not be realized over time, between two and five fabricators will need to be developed to meet 2050 demand.
New Brunswick Supply Chain Study · page 43 of 70
Includes a detailed calculation methodology for supplier requirements based on production time and reactor volume.
Consulting deck · market_sizing · size_opportunity · overcrowded density
Slide locked Sign in to view
Slide schematic 8/8
callout 1/1 list 2/2 paragraph 2/2 source-note 1/1 table 1/1 title 1/1
Components 8
primary bullet bullet paragraph paragraph source-note data headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 1
Frameworks 1