Based on interest expressed by New Brunswick suppliers for the NOAK reactor, the steam turbine and plant electrical systems are unlikely to be manufactured in the province.
New Brunswick Supply Chain Study · page 34 of 70
The chart is a waterfall-style stacked bar chart showing the breakdown of 18 systems.
Consulting deck · data_table · analyze_data · dense density
Slide locked Sign in to view
Slide schematic 5/5
callout 1/1 chart 1/1 paragraph 1/1 source-note 1/1 title 1/1
Components 5
primary bar-stacked paragraph source-note headline
Tools 1
Metrics 1
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.