Slide locked Sign in to view
Slide schematic 6/8
callout 0/1 list 3/3 metric 1/2 subtitle 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 8
callout bullet bullet bullet big-number primary subtitle headline
Tools 0
No tools

No canon tool match is anchored to this slide.

Metrics 1
annual savings cost_savings · $0- $0.5M

The Auxiliary Services function is largely centralized; however, opportunities still exist to further enhance efficiency and provide potential cost savings.

Frameworks 0
No frameworks

No framework match is anchored to this slide.