Based on the Departmental O&M amounts from item #6 above, the potential savings for electric and gas are $1.7 million and $0.8 million, respectively.
Business Cost Optimization at Con Edison · page 91 of 94
This appears to be a page from a formal regulatory filing or discovery response document.
Consulting deck · appendix_disclosure · summarize · dense density
Slide locked Sign in to view
Slide schematic 4/6
callout 0/1 list 1/1 metric 0/1 paragraph 3/3
2 without position callout 1 · metric 1
calloutmetric · primary
Components 6
callout numbered primary paragraph paragraph paragraph
Tools 1
Metrics 1
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.