Slide locked Sign in to view
Slide schematic 6/8
callout 1/2 chart 1/1 disclaimer 1/1 legend 1/1 metric 0/1 title 2/2
2 without position callout 1 · metric 1
calloutmetric · primary
Components 8
primary callout bar-stacked disclaimer legend primary headline subtitle
Tools 3
Metrics 1
Power demand other · 50%

By 2040, data campuses that each consume over 200 MW a year will drive over 50% of the demand for power from US data centers

Frameworks 0
No frameworks

No framework match is anchored to this slide.