Slide locked Sign in to view
Slide schematic 5/7
callout 0/1 list 3/3 metric 0/1 title 2/2
2 without position callout 1 · metric 1
calloutmetric · primary
Components 7
callout bullet bullet bullet primary headline headline
Tools 2
Metrics 1
Run-rate cost savings cost_savings · $70M

Recommendations are estimated to deliver ~$70M in run-rate cost savings and ~$55M in run-rate revenues by 2016.

Frameworks 0
No frameworks

No framework match is anchored to this slide.