We built an analytical model to compare the three options
Port of LA Clean Truck Program · page 13 of 21
The slide uses a series of line charts to compare three options (I, II, III) across four dimensions: environmental impact, labor supply, market structure, and costs.
Consulting deck · comparison_table · compare_options · overcrowded density
Slide locked Sign in to view
Slide schematic 12/14
callout 0/1 chart 4/4 legend 1/1 list 4/4 metric 0/1 source-note 1/1 title 2/2
2 without position callout 1 · metric 1
calloutmetric · primary
Components 14
callout line line line line legend bullet bullet bullet bullet primary source-note headline subtitle
Tools 6
Data Story Arc loop · 72%
Data block opens proof loop: model -> risks -> verdict.
Action Titles slide · 88%Headline 'We built an analytical model to compare the three options'.
Chartjunk Elimination slide · 60%chart/line: Operations: Drayage labor supply (Avg. drayage income $/hr), chart/line: Operations: Drayage costs (Avg drayage cost per container), chart/line: Operations: Drayage market (% of drayage by employees), chart/line: Environmental: % of drayage by clean trucks
Chart Selection Guide slide · 75%Line charts chosen to show 2007-2012 trajectories per option.
Color Strategy slide · 88%Red/Blue/Green legend distinguishes Option I/II/III consistently across all panels.
Small Multiples slide · 90%Four parallel time-series charts share axes and option color encoding.
Metrics 1
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.