Slide locked Sign in to view
Slide schematic 4/4
legend 1/1 list 1/1 paragraph 1/1 title 1/1
Components 4
legend bullet paragraph headline
Tools 5
Metrics 1
capabilities measured other · 31

Figure 2: Our study measured maturity across 31 capabilities that enable resiliency in engineering, supply, production and operations. The highlighted capabilities represent the most important areas where companies should prioritize investment.

Frameworks 1