McKinsey · consulting-deck
Delivering on construction productivity is no longer optional
12 pages · 3 arc beats · 1 loops
Delivering on construction productivity is no longer optional
McKinseyDeck intelligence map
3 Narrative range 7 total
Metadata
Components
Metrics
Tools
Frameworks
Beats
Loops
Problem (Identify pain) 2 slides 100% 2/2 slides 100% 2/2 slides · 14 hits 50% 1/2 slides — 0/2 slides
— 0/2 slides
100% 2/2 slides 100% 2/2 slides Agitate (Make it worse) 4 slides 100% 4/4 slides 100% 4/4 slides · 23 hits 50% 2/4 slides 25% 1/4 slides · 2 hits 25% 1/4 slides 100% 4/4 slides 100% 4/4 slides Solution (Provide relief) 1 slides 100% 1/1 slides 100% 1/1 slides · 5 hits — 0/1 slides
100% 1/1 slides 100% 1/1 slides 100% 1/1 slides — 0/1 slides