Metals Acquisition Corp | Results Presentation Deck | 24 slides · page 13 of 24
Metals Acquisition Corp | Results Presentation Deck | 24 slides · slide 13
Conference presentation · kpi_overview · summarize · overcrowded density
Slide locked Sign in to view
Slide schematic 6/6
chart 2/2 list 1/1 source-note 1/1 title 2/2
Components 6
bar-vertical bar-vertical bullet source-note action-title headline
Tools 2
Waterfall chart slide · 70%
chart/bar-vertical: Processing Costs per tonne ore milled (US$/t) 1 -2% $25.8 Mar Qtr 2024 $31.9 Jun Qtr 2024 $26.3 Sep Qtr 2024 $25.7 Dec Qtr 2024
Waterfall chart slide · 70%chart/bar-vertical: Mining Costs per tonne ore mined (US$/t) 1 -12% $95.7 Mar Qtr 2024 $91.9 Jun Qtr 2024 $85.9 Sep Qtr 2024 $75.2 Dec Qtr 2024
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.