Summit Hotel Properties | Investor Presentation Deck | 32 slides · page 19 of 32
Summit Hotel Properties | Investor Presentation Deck | 32 slides · slide 19
Pitch deck · case_study · illustrate_case · dense density
Slide locked Sign in to view
Slide schematic 6/6
chart 1/1 image 2/2 paragraph 1/1 source-note 1/1 title 1/1
Components 6
bar-vertical photo photo paragraph source-note headline
Tools 2
Before-After-Bridge slide · 70%
The Courtyard Pittsburgh underwent an extensive $5.3MM renovation in 2019 that repositioned the hotel and yielded a 21% ROI based on a stabilized 2022 RevPAR index that increased 18% from pre-renovat
Data Story Arc slide · 60%The Courtyard Pittsburgh underwent an extensive $5.3MM renovation in 2019 that repositioned the hotel and yielded a 21% ROI based on a stabilized 2022 RevPAR index that increased 18% from pre-renovat
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.