Fresnillo | Results Presentation Deck | 45 slides · page 29 of 45
Fresnillo | Results Presentation Deck | 45 slides · slide 29
Conference presentation · kpi_overview · analyze_data · overcrowded density
Slide locked Sign in to view
Slide schematic 7/7
legend 3/3 paragraph 1/1 table 2/2 title 1/1
Components 7
legend legend legend paragraph data data headline
Tools 2
Legend / context slide · 70%
legend: Fresnillo US$103.7 million Mine development and mining works Construction of the Fe Flotation Plant Purchase of in-mine equipment Saucito US$100.2 million Mining Works Purchase of in-mine equipment Tailings dam c
Table data slide · 90%table/data: 2022 743.1 (66.1) (174.7) 502.2 18.3 15.0 33.4 (36.5) 1.4 31.5 (592.1) (202.0) (5.8) (799.9) (266.2) 1,235.3 969.1
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.