E.I. du Pont de Nemours and Company (DuPont) (DD) · page 14 of 87
Uses two waterfall charts to bridge 2014 normalized EPS and 2015 guidance to core EPS needed.
Activist deck · preempt_rebuttal · preempt_rebuttal · overcrowded density
Slide locked Sign in to view
Slide schematic 7/9
callout 0/1 chart 2/2 list 2/2 metric 0/1 source-note 1/1 table 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 9
callout waterfall-bridge waterfall-bridge bullet bullet primary source-note data headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 1