2026 04 Investor Presentation · page 18 of 46
The slide categorizes site development into three stages: current sites (1 GW), active pipeline (3.5 GW), and extended pipeline (>5 GW).
Consulting deck · other · summarize · overcrowded density
Slide locked Sign in to view
Slide schematic 8/9
image 1/1 list 1/1 metric 0/1 paragraph 3/3 source-note 1/1 table 1/1 title 1/1
1 without position metric 1
metric · primary
Components 9
photo bullet primary paragraph paragraph paragraph source-note data headline
Tools 3
Metrics 0
∅
No metrics
No metric insight is anchored to this slide.
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.