Slide locked Sign in to view
Slide schematic 5/6
chart 1/1 disclaimer 1/1 legend 1/1 metric 0/1 title 2/2
1 without position metric 1
metric · primary
Components 6
timeline disclaimer legend primary headline subtitle
Tools 0
No tools

No canon tool match is anchored to this slide.

Metrics 1
Electrolyzer capacity (GW) other · 130

Optimal sequence and ramp up timeline of applications, corresponding infrastructure and skilled jobs required

Frameworks 1