Slide locked Sign in to view
Slide schematic 5/7
callout 0/1 chart 2/2 list 1/1 metric 0/1 source-note 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 7
callout bar-vertical bar-vertical bullet primary source-note headline
Tools 0
No tools

No canon tool match is anchored to this slide.

Metrics 1
T&D cost cost_savings · 5%

T&D cost increases by 5% p.a. as supply increases, despite reducing losses to international benchmark

Frameworks 0
No frameworks

No framework match is anchored to this slide.