Greenfield investments in the sector continue to be limited with political/regulatory uncertainty and administrative constraints - in particular for unsolicited PPP - and low quality of the PPP tenders acting as deterrents to flow of capital.
Infrastructure Barometer Italy · page 7 of 13
The slide uses a background image of an airplane runway at night. Data is presented in four distinct bar charts.
Consulting deck · data_table · analyze_data · overcrowded density
Slide locked Sign in to view
Slide schematic 6/8
callout 0/1 chart 4/4 list 1/1 metric 0/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 8
callout bar-vertical bar-vertical bar-vertical bar-vertical bullet primary headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 1
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.