Slide locked Sign in to view
Slide schematic 4/6
callout 0/1 chart 1/1 list 1/1 metric 0/1 title 2/2
2 without position callout 1 · metric 1
calloutmetric · primary
Components 6
callout bar-stacked bullet primary action-title headline
Tools 1
Metrics 1
Labor Cost cost_savings · $8,908.5K

The one process that has the most significant FTE count outside the Facility Services Division, Perform Maintenance, is also the most costly.

Frameworks 0
No frameworks

No framework match is anchored to this slide.