Slide locked Sign in to view
Slide schematic 3/5
callout 0/1 metric 0/1 subtitle 1/1 table 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 5
callout primary subtitle data headline
Tools 1
Metrics 1
Labor Cost cost_savings · $391.7K

There are 12 processes within the IT function where the majority of labor costs are outside of the IT Division.

Frameworks 0
No frameworks

No framework match is anchored to this slide.