Slide locked Sign in to view
Slide schematic 4/4
chart 1/1 list 1/1 title 2/2
Components 4
bar-stacked bullet action-title headline
Tools 1
Metrics 1
Labor Cost cost_savings · $690.0K

The two processes with the most FTEs are also the most costly for NMSU.

Frameworks 0
∅
No frameworks

No framework match is anchored to this slide.