I alt estimeres 9 ÅV til løbende drift svarende til 5,3 mio. kr. årligt og en engangsinvestering på 1,2 mio. kr.
Budgetanalyse af Forsvaret 2017 Materialesamling Del 2 · page 75 of 482
The chart distinguishes between one-time setup costs (light green) and recurring operational costs (dark green).
Consulting deck · cost_structure · quantify_impact · dense density
Slide locked Sign in to view
Slide schematic 6/7
callout 1/1 chart 1/1 disclaimer 1/1 legend 1/1 metric 0/1 table 1/1 title 1/1
1 without position metric 1
metric · primary
Components 7
primary waterfall disclaimer legend primary data headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 1
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.