Central styring sikrer at indkøb udføres på de rigtige rammer og rammeaftaler udnyttes mest muligt
Budgetanalyse af Forsvaret 2017 Materialesamling Del 2 · page 235 of 482
The slide uses a bar chart to illustrate specific procurement leakage (33.8m DKK and 39.6m DKK) that should have been routed through existing framework agreements.
Consulting deck · diagnosis · diagnose · dense density
Slide locked Sign in to view
Slide schematic 5/5
chart 1/1 list 2/2 source-note 1/1 title 1/1
Components 5
bar-horizontal bullet bullet source-note headline
Tools 0
∅
No tools
No canon tool match is anchored to this slide.
Metrics 1
Frameworks 0
∅
No frameworks
No framework match is anchored to this slide.