Slide locked Sign in to view
Slide schematic 4/4
chart 1/1 paragraph 1/1 table 1/1 title 1/1
Components 4
bar-grouped paragraph data headline
Tools 6
Metrics 1
lead time reduction other · 50%

The estimated result of the project was a 50% reduction of both lead time and working capital.

Frameworks 0
∅
No frameworks

No framework match is anchored to this slide.