Slide locked Sign in to view
Slide schematic 4/6
callout 0/1 chart 1/1 metric 0/1 paragraph 1/1 table 1/1 title 1/1
2 without position callout 1 · metric 1
calloutmetric · primary
Components 6
callout bar-grouped primary paragraph data headline
Tools 6
Metrics 1
lead time reduction other · 50%

The estimated result of the project was a 50% reduction of both lead time and working capital.

Frameworks 0
No frameworks

No framework match is anchored to this slide.