  "docId": "019f6b8f-396d-7449-84da-64056786eb24",
  "docSlug": "jarvis-mckinsey-solicitation-state-of-new-jersey",
  "documentTitle": "mckinsey solicitation state of new jersey",
  "authorId": "mckinsey-solicitation-state-of-new-jersey",
  "authorName": null,
  "documentKindSlug": "consulting-deck",
  "documentKindLabel": "Consulting deck",
  "sourceTypeSlug": "strategy_consulting",
  "sourceTypeLabel": "Strategy consulting",
  "presentationDate": null,
  "orientation": null,
  "aspectRatio": null,
  "pageNumber": 7,
  "pageCount": 50,
  "prevPage": 6,
  "nextPage": 8,
  "slideType": "appendix_disclosure",
  "function": "summarize",
  "density": "balanced",
  "nDataPoints": 0,
  "notes": "This appears to be a page from a Q&A document related to a government procurement process.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019f6b8f-396d-7449-84da-64056786eb24/7",
  "deckHref": "/decks/019f6b8f-396d-7449-84da-64056786eb24",
  "deckJsonHref": "/decks/019f6b8f-396d-7449-84da-64056786eb24.json",
  "deckAnchorHref": "/decks/019f6b8f-396d-7449-84da-64056786eb24#slide-7",
  "components": [
    {
      "bbox": {
        "h": 0.1,
        "w": 0.82,
        "x": 0.09,
        "y": 0.61
      },
      "kind": "paragraph",
      "text": "21. Reference Attachment 1 – Price Schedule/Sheet Line Items 8 – 11. Question: Would the State consider allowing Offerors whose GSA Schedules do not have hourly rates or labor categories to alter the table to conform to their GSA Schedules? Response: Bidders must complete the revised Price Schedule attached to the RFQ as indicated and include hourly rates in Price Lines 8 through 11.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0c8f68da-ac9d-418d-a175-2d52c0b0117e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.16,
        "w": 0.82,
        "x": 0.09,
        "y": 0.44
      },
      "kind": "paragraph",
      "text": "20. Because of the highly specialized nature of this work, some of the necessary types of expertise and associated rates fall outside the parameters of what is normally offered to the Government under a GSA MOBIS schedule. To address this issue, would the State allow a bidder to propose one or more labor categories and rates that exceed the offeror’s current MOBIS schedule, provided reasonable justification is given? Response: Bidders must complete the revised Price Schedule attached to the RFQ as indicated and include hourly rates in Price Lines 8 through 11 and must abide by the requirements in accordance with RFQ Section 4.2.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2d5c6af0-8416-4a59-878e-01a32ff30379",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.16,
        "w": 0.82,
        "x": 0.09,
        "y": 0.28
      },
      "kind": "paragraph",
      "text": "19. Can the State provide additional detail on the system architecture, structure, and content of the BPU Database Management System that the contractor’s database must be compatible with (per Section 3.3.6)? Are there any proprietary software tools or specialized expertise required of the contractor to support this interface? Response: There are no proprietary software tools or special expertise needed. As set forth in Section 3.6 the database should be in a Microsoft format. The Contractor will be provided with a Microsoft compatible electronic workbook to utilize and submit any report through the BPU system.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4ba2a1f3-34ae-4ad1-932b-3f0b6727d2f8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.16,
        "w": 0.82,
        "x": 0.09,
        "y": 0.09
      },
      "kind": "paragraph",
      "text": "18. Section 4.1.9 lists an extensive array of experience requirements that the bidder must meet. Because the RFP covers such an expansive scope, it is unlikely that one firm would have all the resources and experience under one roof to meet the full span of these requirements. Question: Is it necessary that the prime alone meet all of the experience requirements enumerated in 4.1.9, or may the prime draw upon the collective experience of the entire team to demonstrate fulfillment of these requirements? Response: As noted in Section 4.1.10 the bidder may enter into subcontractor arrangements. The subcontractor would be part of the bidder’s team and its experience can be submitted as part of the bidder’s team including the subcontractors.",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "977da37e-37a3-48f5-9fea-261fc6d5a1d3",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 9,
      "from": 1,
      "beatId": "497e898f-dcbf-4695-8f5d-31a137859a1c",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Situation & Context",
      "beatSlug": "consultants-gambit-situation-context",
      "evidence": "The document provides an overview of the program and the requirements for bidders",
      "position": 0,
      "confidence": 0.8,
      "parentBeatName": "Setup",
      "parentBeatSlug": "setup"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}