{
  "docId": "019f6b8e-e3f2-73cd-ba44-d930e8bf3977",
  "docSlug": "jarvis-5-march-2015-mckinsey-bps-operational-review-steering-committee-working",
  "documentTitle": "5 March 2015 McKinsey BPS Operational Review Steering Committee Working",
  "authorId": "5-march-2015-mckinsey-bps-operational-review-steering-committee-working",
  "authorName": null,
  "documentKindSlug": "deck",
  "documentKindLabel": "Deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2015-03-01 00:00:00",
  "orientation": null,
  "aspectRatio": null,
  "pageNumber": 156,
  "pageCount": 220,
  "prevPage": 155,
  "nextPage": 157,
  "slideType": "revenue_buildup",
  "function": "analyze_data",
  "density": "overcrowded",
  "nDataPoints": 60,
  "notes": "The chart illustrates a transition from high-cost separate classrooms to lower-cost inclusion models, showing a crossover point where savings exceed costs.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019f6b8e-e3f2-73cd-ba44-d930e8bf3977/156",
  "deckHref": "/decks/019f6b8e-e3f2-73cd-ba44-d930e8bf3977",
  "deckJsonHref": "/decks/019f6b8e-e3f2-73cd-ba44-d930e8bf3977.json",
  "deckAnchorHref": "/decks/019f6b8e-e3f2-73cd-ba44-d930e8bf3977#slide-156",
  "components": [
    {
      "bbox": {
        "h": 0.4,
        "w": 0.16,
        "x": 0.82,
        "y": 0.15
      },
      "kind": "callout",
      "text": "As critical mass of inclusion classrooms grow, a tipping point will occur allowing elimination of sub/separate classrooms at an increasing rate. The $326M costs of inclusion over 13 years will be fully covered by the final year (SY26-27)",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4b37e52f-8633-43e6-860a-e582629fb8a2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.16,
        "x": 0.82,
        "y": 0.68
      },
      "kind": "callout",
      "text": "By the end of the roll out, BPS could be saving ~$60M annually",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b6c6f05b-487e-48b5-afdb-6fe5a416b92b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.65,
        "x": 0.12,
        "y": 0.1
      },
      "kind": "chart",
      "text": "SPED spend on substantially separate classroom support",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f52241b6-2bf0-4db8-b58f-bd4998554cb2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.15,
        "x": 0.65,
        "y": 0.18
      },
      "kind": "legend",
      "text": "Sub / separate teacher, Sub / separate aide, SPED resource teacher, SPED itinerant teacher",
      "attrs": null,
      "subkind": "legend",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "26a1c442-217d-46e5-9eaf-5acccd037f93",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.95,
        "x": 0.02,
        "y": 0.9
      },
      "kind": "other",
      "text": "1 This roll-out is estimated, as final plans identifying specific classrooms are still in process. Source: Decline in costs scaled to expected decline in classrooms, determined by interviews with BPS staff and outside experts",
      "attrs": null,
      "subkind": "source-note",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "615ce4ea-0dbb-4b96-b361-7446aff01a0d",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.78,
        "x": 0.02,
        "y": 0.55
      },
      "kind": "table",
      "text": "Annual sub/separate costs, Annual inclusion costs, Total SPED budget, Impact of inclusion",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2cd773d2-caad-48a1-8d2d-20f5c2b225e6",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.7,
        "x": 0.02,
        "y": 0.02
      },
      "kind": "title",
      "text": "SPECIAL EDUCATION ...with annual savings that outstrip annual costs by SY18-19",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "86401338-d78a-417b-aef4-6abbf233fe82",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Chart Selection Guide",
      "slug": "chart-selection-guide",
      "agent": "Designer",
      "layer": "slide",
      "matchId": "30a9812c-693d-4928-b64b-81bcc149d899",
      "evidence": "chart/bar-stacked: SPED spend on substantially separate classroom support",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}