{
  "docId": "019de518-d6e0-718f-bbbf-9b6596004453",
  "docSlug": "0864d0e47d31d31e4fb11e2fa0c86f7d",
  "documentTitle": "Metals Acquisition Corp | Results Presentation Deck | 24 slides",
  "authorId": "metals-acquisition-corp",
  "authorName": "Metals Acquisition Corp",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2025-01-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 6,
  "pageCount": 24,
  "prevPage": 5,
  "nextPage": 7,
  "slideType": "revenue_buildup",
  "function": "quantify_opportunity",
  "density": "dense",
  "nDataPoints": 5,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de518-d6e0-718f-bbbf-9b6596004453/6",
  "deckHref": "/decks/019de518-d6e0-718f-bbbf-9b6596004453",
  "deckJsonHref": "/decks/019de518-d6e0-718f-bbbf-9b6596004453.json",
  "deckAnchorHref": "/decks/019de518-d6e0-718f-bbbf-9b6596004453#slide-6",
  "components": [
    {
      "bbox": {
        "h": 0.63,
        "w": 0.6,
        "x": 0.05,
        "y": 0.23
      },
      "kind": "chart",
      "text": "Cu Production Bridge (Tonnes)\n~37,300\n41,128\n~50,500\n2022 Production (Prior Ownership)\nMAC Efficiency gains\n2024 Copper Production\nProductivity Improvements\nVentilation Project\nMid-Point of 2026 guidance\nQTSS Upper\nFuture Upside",
      "attrs": null,
      "subkind": "waterfall",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b84262e0-086d-4e60-bf9d-7d4f9c76200f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.66,
        "w": 0.27,
        "x": 0.69,
        "y": 0.17
      },
      "kind": "list",
      "text": "Pathway to achieve >50ktpa\n1 Optimise Mine Efficiency\nSeveral initiatives implemented\nAnnualised Q4 2024 production already at >45kt p/a without any further productivity improvement or key projects\n2 Productivity Improvements\nDouble stope lifts\nImprovement projects\n3 Ventilation Project\nNew mine ventilation design developed, allowing mining rates up to 1.7Mtpa\nProject underway with completion targeted by mid-2026\n4 QTSS Upper Development\nDrilling underway to upgrade the Resource into Reserve\nOre mining expected to commence from mid-2025",
      "attrs": null,
      "subkind": "numbered",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "385acaf5-a351-4717-8a93-c183ef3e77a2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.59,
        "x": 0.11,
        "y": 0.91
      },
      "kind": "source-note",
      "text": "Notes 1) This is an aspiration statement of prospective production and is not production guidance.",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4fc96c32-8105-4e9a-b5bb-4530792d267e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.65,
        "x": 0.05,
        "y": 0.13
      },
      "kind": "title",
      "text": "Established projects to deliver increased copper production",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b8077348-5524-422e-b5dd-051af07d4c23",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.59,
        "x": 0.05,
        "y": 0.08
      },
      "kind": "title",
      "text": "Clear and achievable pathway to >50ktpa¹",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "37bb34ab-3c4c-4de5-bd8e-16eef95e2466",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Waterfall chart",
      "slug": "waterfall-chart",
      "agent": null,
      "layer": "slide",
      "matchId": "7e619c35-ca45-47a9-a2d4-188ddf03f36d",
      "evidence": "A waterfall chart is used to show the Cu Production Bridge.",
      "confidence": 0.8
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 15,
      "from": 6,
      "beatId": "d6d1b22e-64b9-42ac-aa51-43b23ead050b",
      "arcName": "The Sparkline",
      "arcSlug": "sparkline",
      "beatName": "Potential Improvements",
      "beatSlug": "sparkline-what-could-be-2",
      "evidence": "The following slides highlight operational improvements, growth initiatives, and financial flexibility, showcasing potential for future growth.",
      "position": 1,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [
    {
      "to": 15,
      "from": 6,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "c7c92e18-d360-4e7d-aa3f-e0147cc2e853",
      "evidence": "The slides on operational improvements and growth initiatives imply the consequences of inaction.",
      "position": 0,
      "objective": "Highlighting the cost of not taking action to improve operations and grow the business",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}