{
  "docId": "019de518-1e9e-7594-a01b-3fc1e40e590d",
  "docSlug": "392237a5ca881c89899d03726f0a3b1b",
  "documentTitle": "NewFortress Energy | Results Presentation Deck | 48 slides",
  "authorId": "newfortress-energy",
  "authorName": "NewFortress Energy",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2024-02-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 18,
  "pageCount": 48,
  "prevPage": 17,
  "nextPage": 19,
  "slideType": "propose_solution",
  "function": "propose_solution",
  "density": "overcrowded",
  "nDataPoints": 10,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de518-1e9e-7594-a01b-3fc1e40e590d/18",
  "deckHref": "/decks/019de518-1e9e-7594-a01b-3fc1e40e590d",
  "deckJsonHref": "/decks/019de518-1e9e-7594-a01b-3fc1e40e590d.json",
  "deckAnchorHref": "/decks/019de518-1e9e-7594-a01b-3fc1e40e590d#slide-18",
  "components": [
    {
      "bbox": {
        "h": 0.4,
        "w": 0.38,
        "x": 0.59,
        "y": 0.35
      },
      "kind": "chart",
      "text": "Capacity (GW) from 2023 to 2032, showing Thermal Power Retirements (Cumulative) and Capacity Requirements (Cumulative)",
      "attrs": null,
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d83a47ef-fd9c-423c-96c9-606687659359",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.45,
        "w": 0.35,
        "x": 0.02,
        "y": 0.29
      },
      "kind": "image",
      "text": "Map of Brazil showing gas pipelines and power assets",
      "attrs": null,
      "subkind": "map",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "36198fa3-b6df-45eb-8570-bec9a7c6c1d5",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.38,
        "x": 0.59,
        "y": 0.23
      },
      "kind": "list",
      "text": "2. Brazil forecasts need for 20 GW of new, dispatchable power by 2032(iv)",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "390289a2-6026-4493-b9fe-217073af6bc1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.55,
        "x": 0.02,
        "y": 0.23
      },
      "kind": "list",
      "text": "1. Regional gas supply constraints amidst increasing demand",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "46452654-8c61-44b9-8d09-1c654208b8df",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.45,
        "w": 0.23,
        "x": 0.38,
        "y": 0.32
      },
      "kind": "list",
      "text": "Barcarena\nOnly gas import point in area\nRegional hub for industrial demand\nSanta Catarina (\"TGS\")\n>3.5 GW of existing power connected to TGS without firm gas contracts(i)\n300 TBtu demand(ii) on current pipeline system at >$18/MMBtu all-in tariff(iii)",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5167709b-fc82-4d8a-a3ea-2f8021961043",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.07,
        "w": 0.2,
        "x": 0.02,
        "y": 0.71
      },
      "kind": "list",
      "text": "NFE terminal entry point\nNFE power assets\nPower plants with no firm gas contract\nPipeline",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "87e791b8-d759-4ac1-9cb9-bef27809fa94",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.35,
        "x": 0.62,
        "y": 0.82
      },
      "kind": "paragraph",
      "text": "Expect 8 GW+ capacity auction in 2024 for new & existing thermal power plants",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "388ab4bb-4f04-488c-bed6-110eaffea6aa",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.55,
        "x": 0.03,
        "y": 0.82
      },
      "kind": "paragraph",
      "text": "Opportunity to build & supply >2GW+ of existing & new power in the South & replace declining Bolivian gas supply",
      "attrs": null,
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "800e0880-7b39-47dd-8406-bb34076aab93",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.01,
        "w": 0.5,
        "x": 0.07,
        "y": 0.93
      },
      "kind": "source-note",
      "text": "(i) Source: ONS; (ii) Source: MME; (iii) Source: IGNIS/Gas Energy; (iv) Source: EPE",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4c37e837-ffbb-4d3f-be16-fdf9408c9495",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.72,
        "x": 0.14,
        "y": 0.155
      },
      "kind": "title",
      "text": "Regional constraints on gas supply & new power auctions will drive incremental growth in Brazil",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ef697031-5c0a-4ffd-ac74-7721599e5bb4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.573,
        "x": 0.213,
        "y": 0.09
      },
      "kind": "title",
      "text": "2 significant near-term opportunities in Brazil",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "7d701411-6636-4eed-b609-25e8a02451d4",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [],
  "loops": [
    {
      "to": 20,
      "from": 17,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "8d1478b6-e32d-4cca-96f6-a0bd74775c38",
      "evidence": "The company highlights the need for new thermal power to balance the grid",
      "position": 0,
      "objective": "The cost of inaction in Brazil's power market",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}