{
  "docId": "019de517-cc21-715d-b6d6-772b58215448",
  "docSlug": "6b58544bf8e0a6aeef6ba1318df4ec57",
  "documentTitle": "Gatos Silver | Investor Presentation Deck | 36 slides",
  "authorId": "gatos-silver",
  "authorName": "Gatos Silver",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2024-01-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 24,
  "pageCount": 36,
  "prevPage": 23,
  "nextPage": 25,
  "slideType": "solution",
  "function": "present_solution",
  "density": "overcrowded",
  "nDataPoints": 7,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de517-cc21-715d-b6d6-772b58215448/24",
  "deckHref": "/decks/019de517-cc21-715d-b6d6-772b58215448",
  "deckJsonHref": "/decks/019de517-cc21-715d-b6d6-772b58215448.json",
  "deckAnchorHref": "/decks/019de517-cc21-715d-b6d6-772b58215448#slide-24",
  "components": [
    {
      "bbox": {
        "h": 0.4,
        "w": 0.22,
        "x": 0.72,
        "y": 0.52
      },
      "kind": "chart",
      "text": "Mining Methods\nStope production transitions from ~50% LH in 2024 to ~95% LH towards the end of the mine life\nLonghole Stopes: 2022 LOM 56%, 2023 LOM 74%\nCut and Fill Stopes: 2022 LOM 44%, 2023 LOM 26%",
      "attrs": {},
      "subkind": "bar-vertical",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "39e0bfb0-1937-4780-afa3-a58c5b111af7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.43,
        "w": 0.67,
        "x": 0.05,
        "y": 0.52
      },
      "kind": "image",
      "text": "2023 Mineral Reserve\nNorth-West, Central, South-East, South-East Deeps\nLegend: Developed / mined, 2023 Mineral Reserve - LH Stopes, 2023 Mineral Reserve - C&F Stopes",
      "attrs": {},
      "subkind": "illustration",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0dc026a5-13be-4982-8542-d92cf2439fd7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.14,
        "x": 0.8,
        "y": 0.06
      },
      "kind": "image",
      "text": "GATOS SILVER",
      "attrs": {},
      "subkind": "logo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "68fe32ec-9500-4a66-a037-9516ecce3821",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.2,
        "w": 0.7,
        "x": 0.05,
        "y": 0.26
      },
      "kind": "list",
      "text": "+ Maximizing use of longhole mining methods (74% of stope tonnage)\nHigher productivity and lower cost than cut and fill methods\nDilution and mine recovery factors are based on historical operating information\nPrimarily paste fill planned for longhole stopes\n+ Significant underground development and infrastructure in place",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c8272de4-297b-49b0-90c1-e340d1fa1f15",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.64,
        "x": 0.05,
        "y": 0.2
      },
      "kind": "paragraph",
      "text": "Mining rates of ~2,950 tpd are similar to current operating rates",
      "attrs": {},
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "fe0e6229-5921-40aa-8310-191cbd85930f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.59,
        "x": 0.05,
        "y": 0.08
      },
      "kind": "title",
      "text": "Low risk mine design with operational flexibility",
      "attrs": {},
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "fda73f93-4132-4e87-a99b-f45462613f8f",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.46,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "2023 LOM Plan - Mine Design",
      "attrs": {},
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1ecbefef-3668-4d83-b87f-99f9176a0b60",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 27,
      "from": 22,
      "beatId": "c12b64f7-f86a-4703-837d-950a582c9102",
      "arcName": "The Sequoia Pitch",
      "arcSlug": "sequoia-pitch",
      "beatName": "Financials",
      "beatSlug": "sequoia-pitch-financials",
      "evidence": "The company presents detailed financial information, including production schedules and operating costs.",
      "position": 4,
      "confidence": 0.8,
      "parentBeatName": "Evidence",
      "parentBeatSlug": "evidence"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}