{
  "docId": "019de517-a819-77ed-b0e8-1b27664ecd81",
  "docSlug": "7a48e5731798d42cc274280d7fdbf5cd",
  "documentTitle": "NioCorp | Investor Presentation Deck | 47 slides",
  "authorId": "niocorp",
  "authorName": "NioCorp",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-12-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 44,
  "pageCount": 47,
  "prevPage": 43,
  "nextPage": 45,
  "slideType": "appendix_data",
  "function": "appendix",
  "density": "overcrowded",
  "nDataPoints": 24,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de517-a819-77ed-b0e8-1b27664ecd81/44",
  "deckHref": "/decks/019de517-a819-77ed-b0e8-1b27664ecd81",
  "deckJsonHref": "/decks/019de517-a819-77ed-b0e8-1b27664ecd81.json",
  "deckAnchorHref": "/decks/019de517-a819-77ed-b0e8-1b27664ecd81#slide-44",
  "components": [
    {
      "bbox": {
        "h": 0.085,
        "w": 0.11,
        "x": 0.029,
        "y": 0.884
      },
      "kind": "image",
      "text": "NioCorp\nCritical Mineral Security",
      "attrs": {},
      "subkind": "logo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d48b8afb-3edd-4189-96c1-b11c719eec91",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.199,
        "w": 0.57,
        "x": 0.04,
        "y": 0.453
      },
      "kind": "list",
      "text": "NOTES\nThe Qualified Person for the Mineral Reserve estimate is Richard Jundis, P.Eng., of Optimize Group Inc. The estimate has an effective date of May 3rd, 2022.\nThe Mineral Reserve is based on the mine design and mine plan, utilizing an average cut-off grade of 0.679% Nb2O5 with an NSR of US$ 180/mt.\nThe estimate of Mineral Reserves may be materially affected by metal prices, environmental, permitting, legal, title, taxation, socio-political, marketing, infrastructure development, or other relevant issues.\nThe economic assumptions used to define Mineral Reserve cut-off grade are as follows:\nAnnual life of mine (LOM) average production rate of ~7,450 tonnes of FeNb/annum in the years of full production,\nMining dilution of ~6% was applied to all stopes and development, based on 3% for the primary stopes, 9% for the secondary stopes, and 5% for ore development.\nMining recoveries of 95% were applied in longhole stopes and 62.5% in sill pillar stopes.",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b0e9c6e8-f487-4f68-b94f-62cfbb5930ef",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.209,
        "w": 0.443,
        "x": 0.516,
        "y": 0.659
      },
      "kind": "list",
      "text": "Price assumptions for FeNb, Sc2O3, and TiO2 are based upon independent market analyses for each product.\nPrice and cost assumptions are based on the pricing of products at the \"mine-gate,\" with no additional down-stream costs required.\nThe assumed products are a ferroniobium product (metallic alloy shots consisting of 65%Nb and 35% Fe), a titanium dioxide product in powder form, and scandium trioxide in powder form.\nThe Mineral Reserve has an average LOM NSR of US$ 563.06/tonne.\nRichard Jundis has provided detailed estimates of the expected costs based on the knowledge of the style of mining (underground) and potential processing methods (by 3rd party Qualified Persons).\nMineral reserve effective date May 10th, 2022. The financial model was run post-February 2019, which reflects a total cost per tonne of US$ 196.72 versus US$ 189.91 (May 20, 2022 Mineral Reserve Details Table above). This is not considered a material change.\nPrice variances for commodities are based on updated independent market studies versus earlier projected pricing. The updated independent market studies do not have a negative effect on the reserve.",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b1d06466-101f-491c-a8db-8ea6328c07ce",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.014,
        "w": 0.202,
        "x": 0.399,
        "y": 0.09
      },
      "kind": "paragraph",
      "text": "(not including REE production)",
      "attrs": {},
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4539ab6b-6a15-483b-903c-dc96a1997589",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.012,
        "w": 0.202,
        "x": 0.399,
        "y": 0.157
      },
      "kind": "paragraph",
      "text": "(MINERAL RESERVE AS OF May 10, 2022)",
      "attrs": {},
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9e1c4771-2027-48b6-b4c9-b9f4adfee725",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.026,
        "w": 0.364,
        "x": 0.571,
        "y": 0.934
      },
      "kind": "source-note",
      "text": "Based on the 2022 Elk Creek Technical Report. See \"Mineral Reserves and Resources\" in the Disclaimers & Technical Disclosures at the beginning of this presentation.",
      "attrs": {},
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "231d5503-e920-48d8-b92e-ebdb00beb809",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.406,
        "w": 0.244,
        "x": 0.663,
        "y": 0.208
      },
      "kind": "table",
      "text": "Parameter\nValue\nUnit\nMining Cost\n42.38\nUS$/t mined\nProcessing\n106.70\nUS$/t mined\nWater Management and Infrastructure\n16.62\nUS$/t mined\nTailings Management\n2.01\nUS$/t mined\nOther Infrastructure\n5.47\nUS$/t mined\nGeneral and Administrative\n8.91\nUS$/t mined\nRoyalties/Annual Bond Premium\n8.34\nUS$/t mined\nOther Costs\n6.29\nUS$/t mined\nTotal Cost\n196.72\nUS$/t mined\nNb2O5 to Niobium conversion\n69.60\n%\nNiobium Process Recovery\n82.36\n%\nNiobium Price\n39.60\nUS$/kg\nTiO2 Process Recovery\n40.31\n%\nTiO2 Price\n0.88\nUS$/kg\nSc Process Recovery\n93.14\n%\nSc to Sc2O3 conversion\n153.40\n%",
      "attrs": {},
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "6c139f29-1880-4608-a867-fefd3e3bf7eb",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.206,
        "w": 0.57,
        "x": 0.04,
        "y": 0.208
      },
      "kind": "table",
      "text": "Underground In Situ Mineral Reserves Estimate for Elk Creek\nClassification\nTonnage (Kt)\nNb2O5 Grade (%)\nContained Nb2O5 (t)\nPayable Nb (t)\nTiO2 Grade (%)\nContained TiO2 (t)\nPayable TiO2 (t)\nSc Grade (ppm)\nContained Sc (t)\nPayable SC2O3 (t)\nProven\nProbable\n36,656\n0.81\n297,278\n170,409\n2.92\n1,071,182\n431,793\n70.2\n2,573\n3,677\nTOTAL\n36,656\n0.81\n297,278\n170,409\n2.92\n1,071,182\n431,793\n70.2\n2,573\n3,677",
      "attrs": {},
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "70b7b5dc-d055-4b28-8bbc-793cda9cedda",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.025,
        "w": 0.499,
        "x": 0.299,
        "y": 0.064
      },
      "kind": "title",
      "text": "Elk Creek S-K 1300 Mineral Reserve¹",
      "attrs": {},
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c9a7b7d6-2f0e-437e-9c00-e0d273fd9c8a",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Table data",
      "slug": "table-data",
      "agent": null,
      "layer": "slide",
      "matchId": "48563f3c-c268-4a3f-b938-6091e724f566",
      "evidence": "The slide contains a table with data on Mineral Reserve Estimate.",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}