{
  "docId": "019de517-6262-72a8-b3c3-c18ac18b7953",
  "docSlug": "d6361ee60b851537e8204d2c6f7238d7",
  "documentTitle": "Lucid Motors | Results Presentation Deck | 31 slides",
  "authorId": "lucid-motors",
  "authorName": "Lucid Motors",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-11-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 5,
  "pageCount": 31,
  "prevPage": 4,
  "nextPage": 6,
  "slideType": "kpi_overview",
  "function": "summarize",
  "density": "dense",
  "nDataPoints": 7,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de517-6262-72a8-b3c3-c18ac18b7953/5",
  "deckHref": "/decks/019de517-6262-72a8-b3c3-c18ac18b7953",
  "deckJsonHref": "/decks/019de517-6262-72a8-b3c3-c18ac18b7953.json",
  "deckAnchorHref": "/decks/019de517-6262-72a8-b3c3-c18ac18b7953#slide-5",
  "components": [
    {
      "bbox": {
        "h": 0.35,
        "w": 0.53,
        "x": 0.038,
        "y": 0.154
      },
      "kind": "list",
      "text": "Delivered key milestones as planned in the third quarter:\nLucid Air Pure Rear-Wheel Drive start of production in September and in the process of ramping up production: Lucid's most affordable Air with an unprecedented efficiency of 4.74 miles/kWh\nLucid Air Sapphire start of production in September: Delivered the first set of cars to customers at a special delivery event in early October\nAMP-1 Phase 2 opening in September: Transitioned General Assembly to Phase 2 manufacturing factory in Casa Grande, Arizona\nAMP-2 opening in September: Made history with the opening of the semi knocked-down operation of AMP-2, Saudi Arabia's first-ever car manufacturing factory",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "e8493f97-00f0-443d-9a93-cd933375230b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.36,
        "w": 0.53,
        "x": 0.038,
        "y": 0.53
      },
      "kind": "list",
      "text": "Recent and upcoming highlights:\nAston Martin: Closed the long-term strategic technology arrangement for the supply of Lucid's state-of-the-art electric vehicle powertrain, battery systems, and software; Aston Martin issued ~28.35M ordinary shares to Lucid and paid the first cash installment of $33.0M\nNACS charging: Signed agreement to provide Lucid vehicles access to Tesla Supercharger networks in North America and integrate ports in future vehicles\nLucid Referral Program: Launched in the US to celebrate our impassioned Lucid owners for their commitment to the brand\nLucid Gravity Unveil: Special launch event at the LA Auto Show on November 16; on track for start of production in late 2024",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f0f79fdf-6f02-46e5-803d-eeeaa997c6db",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.05,
        "w": 0.39,
        "x": 0.578,
        "y": 0.743
      },
      "kind": "source-note",
      "text": "1 Excludes over 700 semi-knocked down vehicles manufactured in Casa Grande, AZ but not counted as production until final assembly in AMP-2 in Saudi Arabia\n2 Excludes temporary and satellite service centers",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "df99980e-cdef-4fba-9316-387ca0db8da3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.51,
        "w": 0.39,
        "x": 0.578,
        "y": 0.163
      },
      "kind": "table",
      "text": "KEY STATISTICS\nQuarter-to-date as of September 30, 2023\nLucid Air Customer Deliveries 1,457\nProduction¹ 1,550\nStudios / Service Centers² 45\nRevenue $137.8M\nTotal Liquidity ~$5.45B\nCapital Expenditures ~$192.5M",
      "attrs": null,
      "subkind": "kpi",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "9240b754-9c04-4abf-8e73-560cee5e9ada",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 6,
      "from": 5,
      "beatId": "03a9f270-7d23-4b28-8e1e-6dd8c4a14855",
      "arcName": "The Sequoia Pitch",
      "arcSlug": "sequoia-pitch",
      "beatName": "Problem",
      "beatSlug": "sequoia-pitch-problem",
      "evidence": "The presentation highlights the need for sustainable energy and the challenges in the EV market.",
      "position": 0,
      "confidence": 0.8,
      "parentBeatName": "Complication",
      "parentBeatSlug": "complication"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}