{
  "docId": "019de517-4328-7120-a905-dbb1ddb9887c",
  "docSlug": "6ed2a2e8ec740c7e9c536de8b64f29d6",
  "documentTitle": "Gatos Silver | Investor Presentation Deck | 36 slides",
  "authorId": "gatos-silver",
  "authorName": "Gatos Silver",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-11-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 24,
  "pageCount": 36,
  "prevPage": 23,
  "nextPage": 25,
  "slideType": "solution",
  "function": "present_solution",
  "density": "overcrowded",
  "nDataPoints": 10,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019de517-4328-7120-a905-dbb1ddb9887c/24",
  "deckHref": "/decks/019de517-4328-7120-a905-dbb1ddb9887c",
  "deckJsonHref": "/decks/019de517-4328-7120-a905-dbb1ddb9887c.json",
  "deckAnchorHref": "/decks/019de517-4328-7120-a905-dbb1ddb9887c#slide-24",
  "components": [
    {
      "bbox": {
        "h": 0.42,
        "w": 0.22,
        "x": 0.71,
        "y": 0.51
      },
      "kind": "chart",
      "text": "Mining Methods\nStope production transitions from ~50% LH in 2024 to ~95% LH towards the end of the mine life\nLonghole Stopes: 2022 LOM 56%, 2023 LOM 74%\nCut and Fill Stopes: 2022 LOM 44%, 2023 LOM 26%",
      "attrs": {
        "series_names": [
          "2022 LOM",
          "2023 LOM"
        ],
        "x_axis_labels": [
          "Longhole Stopes",
          "Cut and Fill Stopes"
        ],
        "y_axis_labels": [
          "56%",
          "74%",
          "44%",
          "26%"
        ]
      },
      "subkind": "bar-vertical",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4d2e17ff-dd1d-44bf-8d07-ca3b6be6351c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.44,
        "w": 0.67,
        "x": 0.05,
        "y": 0.51
      },
      "kind": "image",
      "text": "2023 Mineral Reserve\nNorth-West, Central, South-East, South-East Deeps\nLegend: Developed / mined, 2023 Mineral Reserve - LH Stopes, 2023 Mineral Reserve - C&F Stopes",
      "attrs": {},
      "subkind": "illustration",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3c0d77dc-8022-4183-84bf-e38444f3a80e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.13,
        "x": 0.82,
        "y": 0.06
      },
      "kind": "image",
      "text": "GATOS SILVER",
      "attrs": {},
      "subkind": "logo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8b8038ac-e36d-4cc3-8025-f2d2fcdb7637",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.13,
        "w": 0.7,
        "x": 0.05,
        "y": 0.25
      },
      "kind": "list",
      "text": "Maximizing use of longhole mining methods (74% of stope tonnage)\nHigher productivity and lower cost than cut and fill methods\nDilution and mine recovery factors are based on historical operating information\nPrimarily paste fill planned for longhole stopes",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4e4368a8-33b0-4713-93ce-fb38df3ea6c4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.58,
        "x": 0.05,
        "y": 0.43
      },
      "kind": "list",
      "text": "Significant underground development and infrastructure in place",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "68f815ed-9062-4120-9697-108fdcd0b8e8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.6,
        "x": 0.05,
        "y": 0.2
      },
      "kind": "paragraph",
      "text": "Mining rates of ~2,950 tpd are similar to current operating rates",
      "attrs": {},
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "730741cb-4f7d-4af9-96f0-ec984c3889b4",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.02,
        "x": 0.95,
        "y": 0.95
      },
      "kind": "source-note",
      "text": "24",
      "attrs": {},
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4792dc58-0111-485a-9b16-e03acbc45722",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.49,
        "x": 0.05,
        "y": 0.08
      },
      "kind": "title",
      "text": "Low risk mine design with operational flexibility",
      "attrs": {},
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cf99a323-958b-4731-99ac-5bc9370f519a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.44,
        "x": 0.05,
        "y": 0.05
      },
      "kind": "title",
      "text": "2023 LOM Plan - Mine Design",
      "attrs": {},
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4815ad30-fd0d-476a-9a81-3874a4cece1c",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}