{
  "docId": "019de517-03fd-706d-83c2-6c853e74eb20",
  "docSlug": "9657dd172873b6e12750c7b6b1b1c38d",
  "documentTitle": "NewFortress Energy | Investor Presentation Deck | 40 slides",
  "authorId": "newfortress-energy",
  "authorName": "NewFortress Energy",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-10-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 11,
  "pageCount": 40,
  "prevPage": 10,
  "nextPage": 12,
  "slideType": "kpi_overview",
  "function": "summarize",
  "density": "dense",
  "nDataPoints": 10,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de517-03fd-706d-83c2-6c853e74eb20/11",
  "deckHref": "/decks/019de517-03fd-706d-83c2-6c853e74eb20",
  "deckJsonHref": "/decks/019de517-03fd-706d-83c2-6c853e74eb20.json",
  "deckAnchorHref": "/decks/019de517-03fd-706d-83c2-6c853e74eb20#slide-11",
  "components": [
    {
      "bbox": {
        "h": 0.016,
        "w": 0.018,
        "x": 0.953,
        "y": 0.94
      },
      "kind": "source-note",
      "text": "11",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "052d66a9-dd9c-4521-819a-c032035df7d0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.54,
        "w": 0.92,
        "x": 0.039,
        "y": 0.31
      },
      "kind": "table",
      "text": "Project Expected COD(21) Description\nPuerto Rico Power COD achieved 350-400 MW of gas-fired FEMA power (150 MW at Palo Seco, 200-250 MW at San Juan) located near & supplied by our San Juan LNG terminal\nLa Paz, Mexico Power COD achieved 135 MW gas-fired power plant located at our La Paz LNG terminal; provides power to Baja California Sur's grid\nFLNG 1, Mexico Nov. 2023 1.4 MTPA liquefaction facility located offshore Altamira, Mexico; receives gas from the Sur de Texas-Tuxpan pipeline & liquefies it for export\nBarcarena, Brazil Dec. 2023 6 MTPA LNG terminal located at the mouth of the Amazon river; 624 MW power plant also under construction with COD(21) in 2025\nSanta Catarina, Brazil Jan. 2024 6 MTPA LNG terminal located in southern Brazil; will be connected to existing gas distribution pipeline",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5649569e-5157-40a7-8e4f-1d7fae7f6b0e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.699,
        "x": 0.195,
        "y": 0.189
      },
      "kind": "title",
      "text": "We have a number of significant projects that are at or near completion",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "62b805ba-4a23-462f-bbf8-81c516992b8c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.601,
        "x": 0.309,
        "y": 0.09
      },
      "kind": "title",
      "text": "Project/infrastructure updates",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8c0b6d73-6d8d-4075-b3b1-e54079c44f9c",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 16,
      "from": 6,
      "beatId": "9f0bd958-269c-456c-88a3-89c850e448c6",
      "arcName": "The Sequoia Pitch",
      "arcSlug": "sequoia-pitch",
      "beatName": "Solution",
      "beatSlug": "sequoia-pitch-solution",
      "evidence": "The solution is presented through various projects and growth initiatives.",
      "position": 1,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [
    {
      "to": 16,
      "from": 10,
      "name": "Quick Win Big Bet",
      "slug": "47-quick-win-big-bet",
      "bestFor": "Transformation planning, 100-day plans, resource allocation",
      "matchId": "2ae2457f-f22d-45b5-b164-4add9278d475",
      "evidence": "The presentation discusses various projects as key growth drivers.",
      "position": 1,
      "objective": "Presenting significant projects as quick wins and big bets for growth",
      "structure": "The Full List -> Quick Wins (Low effort, High impact) -> Big Bets (High effort, High impact) -> Sequenced Roadmap",
      "confidence": 0.6,
      "description": "Separate initiatives into immediate wins and longer-term strategic bets"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}