{
  "docId": "019de516-c45d-76cf-9da6-53b509c1c254",
  "docSlug": "0bb4213e2bb7f9bf4ea522ad390cee34",
  "documentTitle": "Gatos Silver | Results Presentation Deck | 26 slides",
  "authorId": "gatos-silver",
  "authorName": "Gatos Silver",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-09-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 10,
  "pageCount": 26,
  "prevPage": 9,
  "nextPage": 11,
  "slideType": "kpi_overview",
  "function": "quantify_opportunity",
  "density": "overcrowded",
  "nDataPoints": 14,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de516-c45d-76cf-9da6-53b509c1c254/10",
  "deckHref": "/decks/019de516-c45d-76cf-9da6-53b509c1c254",
  "deckJsonHref": "/decks/019de516-c45d-76cf-9da6-53b509c1c254.json",
  "deckAnchorHref": "/decks/019de516-c45d-76cf-9da6-53b509c1c254#slide-10",
  "components": [
    {
      "bbox": {
        "h": 0.38,
        "w": 0.47,
        "x": 0.477,
        "y": 0.178
      },
      "kind": "chart",
      "text": "Lower sustaining capital requirements towards end of mine life",
      "attrs": {
        "data_values": {
          "2023": [
            21,
            12
          ],
          "2024": [
            21,
            17
          ],
          "2025": [
            22,
            17
          ],
          "2026": [
            20,
            7
          ],
          "2027": [
            15,
            4
          ],
          "2028": [
            1,
            10
          ],
          "2029": [
            null,
            2
          ],
          "2030": [
            null,
            null
          ]
        },
        "series_names": [
          "Underground Development",
          "Infrastructure & Equipment"
        ],
        "x_axis_labels": [
          "2023",
          "2024",
          "2025",
          "2026",
          "2027",
          "2028",
          "2029",
          "2030"
        ],
        "y_axis_labels": [
          "$0",
          "$5",
          "$10",
          "$15",
          "$20",
          "$25",
          "$30",
          "$35",
          "$40",
          "$45",
          "$50"
        ]
      },
      "subkind": "bar-stacked",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5168cce3-de10-4203-8baf-294eee10f130",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.15,
        "x": 0.802,
        "y": 0.06
      },
      "kind": "image",
      "text": "GATOS SILVER",
      "attrs": null,
      "subkind": "logo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "45451df9-3b96-4db9-bc34-6441b71ab6b1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.32,
        "w": 0.48,
        "x": 0.477,
        "y": 0.61
      },
      "kind": "image",
      "text": "Additional development to access new reserve areas",
      "attrs": null,
      "subkind": "map",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "dc1bded9-a530-46d1-90fc-4c954f8ee40e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.42,
        "x": 0.053,
        "y": 0.479
      },
      "kind": "list",
      "text": "+ Key surface infrastructure already in place\n■ Paste plant and fluorine leaching projects complete and operating well",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3a4bb568-84b9-49d6-88a0-b23b3c3c91a0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.24,
        "w": 0.42,
        "x": 0.053,
        "y": 0.208
      },
      "kind": "list",
      "text": "+ Sustaining capital of $160 M over LOM\n■ $93 M increase in go forward capital driven by 2.75 year mine life extension\n■ Additional development at depth in NW, Central and SE zone required\n■ Additional TSF dam raise and supporting mine infrastructure",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4929f074-cb52-4f35-9d4e-033cfb438a88",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.36,
        "x": 0.053,
        "y": 0.723
      },
      "kind": "list",
      "text": "+ Tailings storage facility has further expansion capacity",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4f4b9542-ac04-42b2-9d0c-40490ef1e16a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.36,
        "x": 0.053,
        "y": 0.608
      },
      "kind": "list",
      "text": "+ Stable mine development profile through 2027\n■ In-line with current development rates",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b2bb93f5-15c7-42be-88db-9590064ea78e",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.538,
        "x": 0.053,
        "y": 0.08
      },
      "kind": "title",
      "text": "Higher sustaining capital costs support mine life extension",
      "attrs": null,
      "subkind": "action-title",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ccf67e4e-f9ff-4411-bf06-f81120316b52",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.025,
        "w": 0.202,
        "x": 0.053,
        "y": 0.05
      },
      "kind": "title",
      "text": "Capital Costs",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f7be880a-9686-4db8-825d-0348df2f80a1",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "bf80a204-6b5e-4092-97ab-07ae47e1808c",
      "evidence": "The slide contains a list of bullet points, used to explain capital costs.",
      "confidence": 0.8
    }
  ],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 14,
      "from": 9,
      "beatId": "0af0b436-38f2-42ad-aa1e-78d2a987add8",
      "arcName": "Monroe's Motivated Sequence",
      "arcSlug": "monroes-sequence",
      "beatName": "Satisfaction",
      "beatSlug": "monroes-sequence-satisfaction",
      "evidence": "The presentation provides detailed information on the updated plan, satisfying the audience's need for information.",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [
    {
      "to": 14,
      "from": 6,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "8dc9d415-ee4e-43b5-aec3-42a969325120",
      "evidence": "The presentation implies that not extending the mine life would result in lost opportunities.",
      "position": 0,
      "objective": "Highlighting the cost of not extending the mine life.",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}