{
  "docId": "019de516-8e71-73fe-9a23-139127ad3986",
  "docSlug": "3ba75b9c67002da3775b139cffaa270c",
  "documentTitle": "Li-Cycle | Results Presentation Deck | 23 slides",
  "authorId": "li-cycle",
  "authorName": "Li-Cycle",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-08-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 10,
  "pageCount": 23,
  "prevPage": 9,
  "nextPage": 11,
  "slideType": "kpi_overview",
  "function": "summarize",
  "density": "overcrowded",
  "nDataPoints": 3,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de516-8e71-73fe-9a23-139127ad3986/10",
  "deckHref": "/decks/019de516-8e71-73fe-9a23-139127ad3986",
  "deckJsonHref": "/decks/019de516-8e71-73fe-9a23-139127ad3986.json",
  "deckAnchorHref": "/decks/019de516-8e71-73fe-9a23-139127ad3986#slide-10",
  "components": [
    {
      "bbox": {
        "h": 0.0625,
        "w": 0.6666666666666666,
        "x": 0.2864583333333333,
        "y": 0.4270833333333333
      },
      "kind": "list",
      "text": "Procurement: Long-lead equipment on-site in Rochester - crystallizers and solvent extraction equipment; Largely completed procurement of the majority of bulks, such as steel, cabling and piping",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "077edf52-6ded-4b8f-82ee-a15b59efd0b8",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.6666666666666666,
        "x": 0.2864583333333333,
        "y": 0.5833333333333334
      },
      "kind": "list",
      "text": "Construction: Major buildings nearing completion; Advanced steel and concrete installation; ~40% complete with the steel construction of the utility pipe racks and accelerating pouring of concrete foundations for tank installations; Mechanical and electrical equipment installation underway, including electrical rooms, tanks, crystallizers and solvent extraction equipment; Focus is on actively managing the construction labor as part of the Rochester Hub construction budget of $560 million",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "1d77b174-5584-4f8a-8d56-2520de797ffb",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.020833333333333332,
        "w": 0.4479166666666667,
        "x": 0.2604166666666667,
        "y": 0.3229166666666667
      },
      "kind": "list",
      "text": "Engineering: ~95% of detailed engineering completed",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "4ee84a51-e577-45cf-b4fe-20d5b3892182",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.020833333333333332,
        "w": 0.10416666666666667,
        "x": 0.8604166666666667,
        "y": 0.9520833333333333
      },
      "kind": "source-note",
      "text": "Li-Cycle 10",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8ba508a2-d574-4301-814f-e4953f34856c",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.10416666666666667,
        "w": 0.95625,
        "x": 0.020833333333333332,
        "y": 0.029166666666666667
      },
      "kind": "title",
      "text": "Rochester Hub: Achieved Engineering, Procurement and Construction Milestones, Maintaining Commissioning Start Late 2023",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b10145e7-28d7-48c4-b103-b35a2231ee95",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.020833333333333332,
        "w": 0.3302083333333333,
        "x": 0.334375,
        "y": 0.175
      },
      "kind": "title",
      "text": "Rochester Hub Execution Update",
      "attrs": null,
      "subkind": "subtitle",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "86074800-e083-45fc-9308-6b2906d97304",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 12,
      "from": 7,
      "beatId": "7b39909d-7008-4772-8676-7a9a05bf9f1c",
      "arcName": "The Sparkline",
      "arcSlug": "sparkline",
      "beatName": "Solution & Approach",
      "beatSlug": "consultants-gambit-solution-approach",
      "evidence": "Slides 7-12 detail Li-Cycle's hub and spoke network developments.",
      "position": 3,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [
    {
      "to": 11,
      "from": 10,
      "name": "Quick Win Big Bet",
      "slug": "47-quick-win-big-bet",
      "bestFor": "Transformation planning, 100-day plans, resource allocation",
      "matchId": "620cd7ff-a03a-4e9d-9cfb-ad02d5a4cdca",
      "evidence": "The Rochester hub's progress and planned commissioning demonstrate quick wins.",
      "position": 1,
      "objective": "Achieving engineering, procurement, and construction milestones",
      "structure": "The Full List -> Quick Wins (Low effort, High impact) -> Big Bets (High effort, High impact) -> Sequenced Roadmap",
      "confidence": 0.6,
      "description": "Separate initiatives into immediate wins and longer-term strategic bets"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}