  "docId": "019de516-815f-768f-bd93-bbf4882dfed2",
  "docSlug": "0a1e356198f7d6003097a86c5e0c5e6b",
  "documentTitle": "Idacorp | Investor Presentation Deck | 43 slides",
  "authorId": "idacorp",
  "authorName": "IDACORP",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-08-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 27,
  "pageCount": 43,
  "prevPage": 26,
  "nextPage": 28,
  "slideType": "appendix_data",
  "function": "other",
  "density": "dense",
  "nDataPoints": 10,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de516-815f-768f-bd93-bbf4882dfed2/27",
  "deckHref": "/decks/019de516-815f-768f-bd93-bbf4882dfed2",
  "deckJsonHref": "/decks/019de516-815f-768f-bd93-bbf4882dfed2.json",
  "deckAnchorHref": "/decks/019de516-815f-768f-bd93-bbf4882dfed2#slide-27",
  "components": [
    {
      "bbox": {
        "h": 0.01,
        "w": 0.03,
        "x": 0.02,
        "y": 0.96
      },
      "kind": "source-note",
      "text": "A-3",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b839f6f9-30ef-47c2-9a42-9dd7bef057dd",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.79,
        "w": 0.96,
        "x": 0.02,
        "y": 0.17
      },
      "kind": "table",
      "text": "Rate Jurisdiction, Filing Date, Filing Description, Annual Revenue Change, Status, Comments/Status, Idaho, 6/3/2021, Jim Bridger Plant Accelerated Recovery, +$18.8 Million, Rates approved 6/1/2022, IPUC approved as prudent all investments made at the plant since 2011, as well as cost recovery concurrent with the plan to cease participation in coal-fired operations at the Jim Bridger plant by 2028. Difference between $27.1 million request and $18.8 million rate increase to be recorded in balancing account for future recovery., Idaho, 11/4/2021, Speculative High-Density Load Customers, N/A, Approved tariffs 7/5/2022, Application to create a new customer class that would be applicable to commercial and industrial cryptocurrency mining operations, or any other speculative high-density load customers less than 20 MW. Petition for reconsideration filed by a third party denied by IPUC. Idaho Power requested an order to establish interruption period of between June 15-September 15, to include a compensation rate for interruption., Idaho, 4/29/2022, Application for CPCN, N/A, Closed, Application requesting Certificate of Public Convenience and Necessity authorizing Idaho Power to install, own, and operate two battery storage facilities with a combined capacity of 120 MW. Certificate granted February 2023., Idaho, 10/20/2022, Wildfire Mitigation Plan Approval, N/A, Cost deferral approved, In March 2023, the IPUC approved Idaho Power's updated WMP and request to defer and estimated $16 million of additional incremental costs., Oregon, 9/30/2022, Application for CPCN, N/A, Closed, Application requesting Certificate of Public Convenience and Necessity authorizing Idaho Power to construct 300-mile long 500kV transmission line between Boardman, Oregon and the Hemingway substation in Idaho. Order received June 2023., Idaho, 1/10/2023, Application for CPCN, N/A, Closed, Application requesting Certificate of Public Convenience and Necessity authorizing Idaho Power to construct 300-mile long 500kV transmission line between Boardman, Oregon and the Hemingway substation in Idaho. Order received June 2023., Idaho, 2/21/2023, Application for CPCN, N/A, Open, Application requesting Certificate of Public Convenience and Necessity authorizing Idaho Power to acquire 60-MW battery storage resources to be online by 2024 and approval of 100-MW solar PPA with Franklin Solar LLC., Idaho, 4/17/2023, Application to implement PCA rates, +$200.2 million, Approved tariffs 5/31/2023, IPUC approved, with modifications, the Company's PCA balancing adjustment as reasonable, ordering the cost recovery of the deferral balance equally over a two-year period beginning June 1, 2023. Idaho Power is also required to notify the IPUC of any outcome on the Hells Canyon Unit No. 3 damage claim., Idaho, 6/1/2023, General Rate Case, +$111.3 million, Open, Filing targets a rate increase January 1, 2024, or 8.61% average customer rate increase. Idaho retail rate base of $3.9 billion, requested ROE of 10.4%, 51% equity capitalization. Rate mitigation requested to increase maximum ADITCs available in each year by an amount necessary to cover revenue requirement of battery storage projects.",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "8459c08e-b32c-483c-96aa-e91c5146ac65",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.66,
        "x": 0.02,
        "y": 0.09
      },
      "kind": "title",
      "text": "Select Recent Regulatory Activity",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "71708ec6-a9f4-4972-a67a-b709537d02ab",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Table data",
      "slug": "table-data",
      "agent": null,
      "layer": "slide",
      "matchId": "11fc8143-a0da-447d-a9f0-b7a0ff254a01",
      "evidence": "The slide contains a table/data with information about Select Recent Regulatory Activity, including rate jurisdiction, filing dates, and descriptions.",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}