{
  "docId": "019de515-3f12-7348-9e8f-0a167fc46ea0",
  "docSlug": "1d2b6e471cb1956e690bcb63d8feed53",
  "documentTitle": "Fresnillo | Results Presentation Deck | 45 slides",
  "authorId": "fresnillo",
  "authorName": "Fresnillo",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2023-03-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.2938006,
  "pageNumber": 14,
  "pageCount": 45,
  "prevPage": 13,
  "nextPage": 15,
  "slideType": "kpi_overview",
  "function": "summarize",
  "density": "dense",
  "nDataPoints": 5,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 0.9,
  "imagePath": null,
  "slideHref": "/slides/019de515-3f12-7348-9e8f-0a167fc46ea0/14",
  "deckHref": "/decks/019de515-3f12-7348-9e8f-0a167fc46ea0",
  "deckJsonHref": "/decks/019de515-3f12-7348-9e8f-0a167fc46ea0.json",
  "deckAnchorHref": "/decks/019de515-3f12-7348-9e8f-0a167fc46ea0#slide-14",
  "components": [
    {
      "bbox": {
        "h": 0.62,
        "w": 1,
        "x": 0,
        "y": 0.24
      },
      "kind": "image",
      "text": null,
      "attrs": {},
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "842d0d4d-ee81-4383-b4ee-b91a589d3ddf",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.41,
        "w": 0.454,
        "x": 0.515,
        "y": 0.359
      },
      "kind": "list",
      "text": "Completed the tie in of the flotation plant to the national grid\nDespite the delay, mineralised material from development and initial production stopes was processed at the Fresnillo and Saucito beneficiation plants during the year\nDevelopment of the mine continued to advance, reaching almost 58km by the end of the year\nCommissioning and tests with low ore grade material are underway\nRamp up of production expected to progress smoothly, with the objective of achieving nameplate capacity by 3Q23\nOnce at full capacity, the average silver ore grade is expected to be around 400 g/t, with the gold ore grade expected to average 1.0 g/t",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "ff7d7dc6-06bc-41b1-9a42-0d13348049af",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.014,
        "w": 0.43,
        "x": 0.026,
        "y": 0.207
      },
      "kind": "paragraph",
      "text": "JUANICIPIO (JV WITH MAG SILVER. FRESNILLO: 56%)",
      "attrs": {},
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "201ceeab-f763-449d-9239-f97480f83b61",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.026,
        "w": 0.57,
        "x": 0.026,
        "y": 0.172
      },
      "kind": "title",
      "text": "2022 PRELIMINARY RESULTS – OPERATIONS",
      "attrs": {},
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a41e7ba7-5a18-46d8-97af-a1868c5e3f0d",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 21,
      "from": 11,
      "beatId": "09a31f1a-5d4d-4b23-a0ab-111b4cd634f2",
      "arcName": "Monroe's Motivated Sequence",
      "arcSlug": "monroes-sequence",
      "beatName": "Satisfaction",
      "beatSlug": "monroes-sequence-satisfaction",
      "evidence": "Operational and projects performance, reserves and resources, and exploration update",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}