{
  "docId": "019de514-1b2b-7332-964b-2ced22bab04f",
  "docSlug": "f3fca7777e7021f198bb660e7bdcf533",
  "documentTitle": "NioCorp | SPAC Presentation Deck | 46 slides",
  "authorId": "niocorp",
  "authorName": "NioCorp",
  "documentKindSlug": "pitchdeck",
  "documentKindLabel": "Pitch deck",
  "sourceTypeSlug": "investment_bank",
  "sourceTypeLabel": "Investment bank",
  "presentationDate": "2022-09-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 44,
  "pageCount": 46,
  "prevPage": 43,
  "nextPage": 45,
  "slideType": "appendix_data",
  "function": "appendix",
  "density": "overcrowded",
  "nDataPoints": 30,
  "notes": null,
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de514-1b2b-7332-964b-2ced22bab04f/44",
  "deckHref": "/decks/019de514-1b2b-7332-964b-2ced22bab04f",
  "deckJsonHref": "/decks/019de514-1b2b-7332-964b-2ced22bab04f.json",
  "deckAnchorHref": "/decks/019de514-1b2b-7332-964b-2ced22bab04f#slide-44",
  "components": [
    {
      "bbox": {
        "h": 0.08,
        "w": 0.12,
        "x": 0.02,
        "y": 0.88
      },
      "kind": "image",
      "text": "NioCorp\nCritical Mineral Security",
      "attrs": {},
      "subkind": "logo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "340c8c10-c7cf-40d0-a464-d11811ddede9",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.29,
        "w": 0.39,
        "x": 0.55,
        "y": 0.63
      },
      "kind": "list",
      "text": "Price assumptions are as follows: FeNb US$ 39.60/kg Nb, Sc₂O₃ US $3,675/kg, and TiO₂ US $0.88/kg. Price assumptions are based upon independent market analyses for each product as of June 30, 2022\nPrice and cost assumptions are based on the pricing of products at the \"mine-gate,\" with no additional down-stream costs required. The assumed products are ferroniobium (metallic alloy shots consisting of 65%Nb and 35% Fe), a titanium dioxide product in powder form, and scandium trioxide in powder form.\nThe Mineral Reserve has an average LOM NSR of US$ 563.06/tonne.\nOptimize Group has provided detailed estimates of the expected costs based on the knowledge of the style of mining (underground) and potential processing methods (by 3rd party Qualified Persons).\nMineral reserve effective date is June 30, 2022. The financial model was run after the estimate of the NSR above, which reflects a total cost per tonne of US$ 196.72 versus US$ 189.91. This is not considered a material change.\nPrice variances for commodities are based on independent market studies versus earlier projected pricing. The independent market studies do not have a negative effect on the reserve.",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "76db1b2d-6a5a-4e38-a67e-200ffd5e9bc3",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.4,
        "w": 0.55,
        "x": 0.08,
        "y": 0.45
      },
      "kind": "list",
      "text": "NOTES\nThe Qualified Person for the Mineral Reserve estimate is Optimize Group Inc. The estimate has an effective date of June 30, 2022.\nThe Mineral Reserve is based on the mine design, mine plan, and cash-flow model utilizing an average cut-off grade of 0.679% Nb2O5 with an NSR of US$ 180/t.\nThe estimate of Mineral Reserves may be materially affected by metal prices, environmental, permitting, legal, title, taxation, socio-political, marketing, infrastructure development, or other relevant issues.\nThe economic assumptions used to define Mineral Reserve cut-off grade are as follows:\nAnnual life of mine (LOM) production rate of ~7,450 tonnes of FeNb/annum during the years of full production.\nInitial elevated five-year production rate ~ 7,500 tonnes of FeNb/annum when full production is reached.\nMining dilution of ~6% was applied to all stopes and development, based on 3% for the primary stopes, 9% for the secondary stopes, and 5% for ore development.\nMining recoveries of 95% were applied in longhole stopes and 62.5% in sill pillar stopes.",
      "attrs": {},
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a56a2b08-b992-4a58-b7bd-0524f1f44798",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.39,
        "x": 0.39,
        "y": 0.15
      },
      "kind": "paragraph",
      "text": "(MINERAL RESERVE AS OF June 30, 2022)",
      "attrs": {},
      "subkind": "paragraph",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "f513de55-3f9f-40c1-af1e-7d3aa6d428fa",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.04,
        "w": 0.39,
        "x": 0.57,
        "y": 0.92
      },
      "kind": "source-note",
      "text": "1 Based on the S-K 1300 Elk Creek Technical Report Summary. See \"Mineral Reserves and Resources\" in the Disclaimers & Technical Disclosures at the beginning of this presentation.",
      "attrs": {
        "numbered": true
      },
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "08ec3b60-88dd-4343-838c-2e7b635b200b",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.23,
        "w": 0.57,
        "x": 0.07,
        "y": 0.2
      },
      "kind": "table",
      "text": "Underground In Situ Mineral Reserves Estimate for Elk Creek\nClassification Tonnage (Kt) Nb2O5 Grade (%) Contained Nb2O5 (t) Payable Nb (t) TiO2 Grade (%) Contained TiO2 (t) Payable TiO2 (t) Sc Grade (ppm) Contained Sc (t) Payable Sc2O3 (t)\nProven -\nProbable 36,656 0.81 297,278 170,409 2.92 1,071,182 431,793 70.2 2,573 3,677\nTOTAL 36,656 0.81 297,278 170,409 2.92 1,071,182 431,793 70.2 2,573 3,677",
      "attrs": {},
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "50e2f9a9-8a18-4104-a79c-30ada9159b42",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.6,
        "w": 0.29,
        "x": 0.65,
        "y": 0.2
      },
      "kind": "table",
      "text": "Parameter Value Unit\nMining Cost 42.38 US$/t mined\nProcessing 106.70 US$/t mined\nWater Management and Infrastructure 16.62 US$/t mined\nTailings Management 2.01 US$/t mined\nOther Infrastructure 5.47 US$/t mined\nGeneral and Administrative 8.91 US$/t mined\nRoyalties/Annual Bond Premium 8.34 US$/t mined\nOther Costs 6.29 US$/t mined\nTotal Cost 196.72 US$/t mined\nNb₂O₃ to Niobium conversion 69.60 %\nNiobium Process Recovery 82.36 %\nNiobium Price 39.60 US$/kg\nTiO₂ Process Recovery 40.31 %\nTiO₂ Price 0.88 US$/kg\nSc Process Recovery 93.14 %\nSc to Sc₂O₃ conversion 153.40 %\nSc Price 3,675.00 US$/kg",
      "attrs": {},
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "52d983db-a198-4c8a-857a-802a36c0addc",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.06,
        "w": 0.61,
        "x": 0.32,
        "y": 0.06
      },
      "kind": "title",
      "text": "Elk Creek S-K 1300 Mineral Reserve1\n(not including REE production)",
      "attrs": {},
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "d914dafb-c29b-4a1b-8dc9-dc683212b675",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "Table data",
      "slug": "table-data",
      "agent": null,
      "layer": "slide",
      "matchId": "05ee0a9c-2ca4-4890-9001-f8f5b7c71039",
      "evidence": "table/data: Underground In Situ Mineral Reserves Estimate for Elk Creek",
      "confidence": 0.9
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}