{
  "docId": "019de513-9bed-71e4-bebb-bd9a0da5425f",
  "docSlug": "80e34a762812e6af45210ec5b38e346f",
  "documentTitle": "GlobalFoundries | Mergers and Acquisitions Presentation Deck | 7 slides",
  "authorId": "globalfoundries",
  "authorName": "GlobalFoundries",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investment_bank",
  "sourceTypeLabel": "Investment bank",
  "presentationDate": "2022-07-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 5,
  "pageCount": 7,
  "prevPage": 4,
  "nextPage": 6,
  "slideType": "propose_solution",
  "function": "present_solution",
  "density": "dense",
  "nDataPoints": 2,
  "notes": "The slide uses a site plan to illustrate physical expansion phases (Phase 0 and Phase 1-3) alongside operational management details.",
  "elementsJson": null,
  "metadataConfidence": 0.95,
  "imagePath": null,
  "slideHref": "/slides/019de513-9bed-71e4-bebb-bd9a0da5425f/5",
  "deckHref": "/decks/019de513-9bed-71e4-bebb-bd9a0da5425f",
  "deckJsonHref": "/decks/019de513-9bed-71e4-bebb-bd9a0da5425f.json",
  "deckAnchorHref": "/decks/019de513-9bed-71e4-bebb-bd9a0da5425f#slide-5",
  "components": [
    {
      "bbox": {
        "h": 0.6,
        "w": 0.38,
        "x": 0.02,
        "y": 0.308
      },
      "kind": "image",
      "text": "Site plan showing facility layout with highlighted expansion areas",
      "attrs": null,
      "subkind": "map",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "925665b6-81c6-4c37-9a9e-59c771bedc90",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.45,
        "x": 0.52,
        "y": 0.27
      },
      "kind": "list",
      "text": "On site GF management supplemented by Dresden expertise; Direct oversight of all planning and operations; Depreciation, fixed and variable cost sharing model based on actual utilization and consumption; Stable and low-cost energy supply through French Nuclear energy network",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a0a3fbdc-ae99-4bb4-9ad1-5e63e491b252",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.4,
        "x": 0.52,
        "y": 0.7
      },
      "kind": "list",
      "text": "Phase 0: 3k sqm cleanroom, under construction for 22FDX Capability Tools; Phase 1-3: starting Jul '22, first tool move-in Q4 '23",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "c5bbc2c9-ce38-4cd0-a306-11b28ee635a7",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.08,
        "w": 0.45,
        "x": 0.02,
        "y": 0.05
      },
      "kind": "title",
      "text": "Modular capacity extension",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "3431abb2-6734-42c8-b163-54afed7dbc09",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [],
  "frameworks": [],
  "arcBeats": [
    {
      "to": 6,
      "from": 5,
      "beatId": "5eba24f2-1097-4a2e-80ce-655b7019a9a3",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Solution & Approach",
      "beatSlug": "consultants-gambit-solution-approach",
      "evidence": "propose solution and thesis headline",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [
    {
      "to": 6,
      "from": 3,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "4f5edbec-703e-4248-94ca-fbd50a4dc211",
      "evidence": "implied cost of inaction through proposed solution",
      "position": 0,
      "objective": "demonstrate capital efficiency",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}