  "docId": "019de512-90ea-750b-a61b-9125bfb29150",
  "docSlug": "d4fa40cae86609139284d952a6824b4d",
  "documentTitle": "Fresnillo | Results Presentation Deck | 49 slides",
  "authorId": "fresnillo",
  "authorName": "Fresnillo",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2022-03-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.4138439,
  "pageNumber": 42,
  "pageCount": 49,
  "prevPage": 41,
  "nextPage": 43,
  "slideType": "kpi_overview",
  "function": "summarize",
  "density": "overcrowded",
  "nDataPoints": 14,
  "notes": "Includes two photos of the mining site.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de512-90ea-750b-a61b-9125bfb29150/42",
  "deckHref": "/decks/019de512-90ea-750b-a61b-9125bfb29150",
  "deckJsonHref": "/decks/019de512-90ea-750b-a61b-9125bfb29150.json",
  "deckAnchorHref": "/decks/019de512-90ea-750b-a61b-9125bfb29150#slide-42",
  "components": [
    {
      "bbox": {
        "h": 0.33,
        "w": 0.46,
        "x": 0.51,
        "y": 0.223
      },
      "kind": "image",
      "text": "Aerial view of open pit mine",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "0c8dd0ae-f681-4ae4-b428-2aa73a192dec",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.33,
        "w": 0.46,
        "x": 0.03,
        "y": 0.223
      },
      "kind": "image",
      "text": "Night view of processing plant",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "104f0e25-afb2-4c5e-95fd-4f69c97ade3a",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.25,
        "w": 0.22,
        "x": 0.27,
        "y": 0.54
      },
      "kind": "list",
      "text": "2022 PRIORITIES: Maintain strict safety protocols; Commission and ramp up the Carbon in Column project; Begin to implement recommendations from the pit slope optimisation study; Advance the construction of the 15th leaching pad",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "a1fdef58-7dc0-45e8-8854-d2ef9e29fb38",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.25,
        "x": 0.03,
        "y": 0.54
      },
      "kind": "list",
      "text": "2021 SUMMARY: As the scope of the Carbon in Column project increased, construction will be finished in mid-2022; Concluded the conversion of our haulage fleet to the dual fuel system; Construction of the 14th leaching pad was concluded; Several initiatives to reduce dust at loading bays were implemented; Despite the implementation of the labour reform, utilisation rates of our haulage fleet increased",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cee5e7a1-0a32-43cb-96a3-1c276d856891",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.02,
        "w": 0.1,
        "x": 0.03,
        "y": 0.875
      },
      "kind": "source-note",
      "text": "* As of 31 May 2021",
      "attrs": null,
      "subkind": null,
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "fa54e209-00a1-453a-9976-8f9de332a674",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.35,
        "w": 0.46,
        "x": 0.51,
        "y": 0.54
      },
      "kind": "table",
      "text": "KEY OPERATING HIGHLIGHTS: Silver production (0.9/1.3), Gold production (421.5/425.3), Cash cost (900.4/727.9), AISC (1,100.2/881.9), Reserves 2021 (5,638), Resources 2021 (7,597), Gold grade (0.73/0.76)",
      "attrs": null,
      "subkind": "data",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "5c5e55e1-451b-432d-aa62-8b7753bf58a0",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.03,
        "w": 0.5,
        "x": 0.02,
        "y": 0.14
      },
      "kind": "title",
      "text": "2021 PRELIMINARY RESULTS - OPERATIONS HERRADURA",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "685a6c31-20ae-46a4-a67e-699e054659ed",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "a63ddb0a-af69-423a-bc63-1c3b55ced4da",
      "evidence": "list/bullet: 2021 SUMMARY: As the scope of the Carbon in Column project increased, construction will be finished in mid-2022; Concluded the conversion of our haulage fleet to the dual fuel system; Construction of the 14t",
      "confidence": 0.7
    }
  ],
  "frameworks": [],
  "arcBeats": [],
  "loops": [],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}