{
  "docId": "019de510-cca3-72bf-aa10-03c46d6a2f69",
  "docSlug": "be9c03f8264ad65617ab9f992ee69292",
  "documentTitle": "Vale | Investor Presentation Deck | 55 slides",
  "authorId": "vale",
  "authorName": "Vale",
  "documentKindSlug": "conference-presentation",
  "documentKindLabel": "Conference presentation",
  "sourceTypeSlug": "investor_relations",
  "sourceTypeLabel": "Investor relations",
  "presentationDate": "2021-04-01 00:00:00",
  "orientation": "landscape",
  "aspectRatio": 1.7777778,
  "pageNumber": 18,
  "pageCount": 55,
  "prevPage": 17,
  "nextPage": 19,
  "slideType": "roadmap",
  "function": "plan_implementation",
  "density": "dense",
  "nDataPoints": 8,
  "notes": "The slide is divided into two sections: Copper (top) and Nickel (bottom), with specific project details and strategic summaries for each.",
  "elementsJson": null,
  "metadataConfidence": 1,
  "imagePath": null,
  "slideHref": "/slides/019de510-cca3-72bf-aa10-03c46d6a2f69/18",
  "deckHref": "/decks/019de510-cca3-72bf-aa10-03c46d6a2f69",
  "deckJsonHref": "/decks/019de510-cca3-72bf-aa10-03c46d6a2f69.json",
  "deckAnchorHref": "/decks/019de510-cca3-72bf-aa10-03c46d6a2f69#slide-18",
  "components": [
    {
      "bbox": {
        "h": 0.15,
        "w": 0.25,
        "x": 0.73,
        "y": 0.4
      },
      "kind": "callout",
      "text": "Copper: ~500 ktpy with projects already in the pipeline and potential to organically reach 900 ktpy capacity",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "2c15801b-aee6-4481-8796-6a97ad3f79f1",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.15,
        "w": 0.25,
        "x": 0.73,
        "y": 0.7
      },
      "kind": "callout",
      "text": "Nickel: Focus on de-risking with stabilized production and growth potential in South Atlantic and Indonesia",
      "attrs": null,
      "subkind": "primary",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "82d61047-1e58-427a-a3ee-248527650cf5",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.45,
        "x": 0.05,
        "y": 0.35
      },
      "kind": "image",
      "text": "Salobo III, Alemão, Cristalino, Hu'ú, VBME, Copper Cliff Mine, Onça Puma 2nd furnace, Bahodopi and Pomalaa",
      "attrs": null,
      "subkind": "photo",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "cd4e6dfd-0cec-4b44-9927-c163aa1b16f2",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.5,
        "w": 0.3,
        "x": 0.21,
        "y": 0.35
      },
      "kind": "list",
      "text": "Start-up and capacity data for 8 mining projects",
      "attrs": null,
      "subkind": "bullet",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "40b854c7-61c4-47dc-9b69-e35fdc3708ca",
      "frameworkName": null,
      "frameworkSlug": null
    },
    {
      "bbox": {
        "h": 0.1,
        "w": 0.9,
        "x": 0.05,
        "y": 0.18
      },
      "kind": "title",
      "text": "Assets and expansion plan in transition metals are platforms to the low-carbon economy",
      "attrs": null,
      "subkind": "headline",
      "toolName": null,
      "toolSlug": null,
      "confidence": null,
      "componentId": "b9f21893-95c5-4a09-b7cd-dab63410a16d",
      "frameworkName": null,
      "frameworkSlug": null
    }
  ],
  "metrics": [],
  "tools": [
    {
      "name": "List presentation",
      "slug": "list-presentation",
      "agent": null,
      "layer": "slide",
      "matchId": "3f2c917e-30d8-4868-9e64-7ba55c13f967",
      "evidence": "list/bullet: Start-up and capacity data for 8 mining projects",
      "confidence": 0.7
    }
  ],
  "frameworks": [
    {
      "name": "roadmap",
      "slug": null,
      "matchId": "53f190c5-bf01-41a0-9f45-5bf46255f9e9",
      "evidence": "The slide outlines project timelines and capacity targets for future growth.",
      "confidence": 0.9
    }
  ],
  "arcBeats": [
    {
      "to": 46,
      "from": 15,
      "beatId": "a683fb4a-c3b7-4d8a-baf1-8d90d71a86ad",
      "arcName": "The Consultant's Gambit",
      "arcSlug": "consultants-gambit",
      "beatName": "Solution & Approach",
      "beatSlug": "consultants-gambit-solution-approach",
      "evidence": "Slides 15-46 outline Vale's solution and approach to building a better future.",
      "position": 2,
      "confidence": 0.8,
      "parentBeatName": "Turn",
      "parentBeatSlug": "turn"
    }
  ],
  "loops": [
    {
      "to": 23,
      "from": 15,
      "name": "Cost Of Inaction",
      "slug": "27-cost-of-inaction",
      "bestFor": "Urgent budget requests, compliance, risk mitigation",
      "matchId": "fd2f4146-d595-4f03-9ffa-7ef0caaa0ff8",
      "evidence": "Slides 15-23 discuss the importance of resuming iron ore capacity and maximizing flight to quality.",
      "position": 0,
      "objective": "To highlight the cost of inaction and the benefits of Vale's strategy",
      "structure": "The Status Quo -> The Hidden Costs Accumulating -> The Future State of Inaction -> The Tipping Point",
      "confidence": 0.6,
      "description": "Quantify what happens if the audience does nothing"
    }
  ],
  "imagePathAlt": null,
  "thumbSrc": null,
  "thumbSrcAlt": null,
  "locked": true
}